A Model YK20 (YK-2)
Two main parameters: a workload: 19.6KN (2tf). 2, the static test load: 49KN (5tf). 3, the screw travel: 200mm. 4, clamp weight: 4kg.
Uses: used to live or indirectly, power outage to replace the 35/110kV line tension single string of insulators.
Use to be equipped with tools (sold separately): 1, insulation drawing board, prop bottle rack 3, the operating rod 4, the cancellation of clamp
, Methods of operation: insulated card assembly before and after the drawing board connection, people stand on the cross arm, holding the back of the drawing board before the card hanging on the strain clamp, operating the drawing board before the card to the left under the tilt and shake before the card, the slide pin to seal the mount point. After the card hanging in the right angle screws on the peg board. Install propping frame. Tighten the screw, the removal of the spring pin insulator string relaxation, can be replaced. Note: size (a) 57 (h) can be based on user needs processing.
|